A folder is not a project record
Cloud storage can hold files, but it does not automatically explain which drawing revision drove an RFI, which photo supports a change, or which daily log recorded the delay.
Construction Document Management Software
Most construction document problems are not caused by a missing folder. They come from people working from different versions, photos without context, unanswered RFIs, submittals detached from the spec, and field notes that never make it back to the office. SiteStamp is built for contractors who need the record to be simple enough for the field and complete enough for the office.
$69.99/month flat. Unlimited users. Unlimited projects. No credit card required for trial.
Drawings, RFIs, submittals, photos, logs, and change orders
Field-friendly records for supervisors and admins
Searchable project context instead of scattered files
$69.99/month flat with unlimited users
These are the practical problems buyers want answered before they trust another construction software platform.
Cloud storage can hold files, but it does not automatically explain which drawing revision drove an RFI, which photo supports a change, or which daily log recorded the delay.
When the field builds from stale drawings or misses a revised document, the cost shows up as rework, schedule friction, and credibility damage with owners.
Payroll, billing, change orders, and closeout all depend on field records that can be found later without reconstructing the job from text messages.
A practical system should keep current drawings available, make RFIs and submittals easy to find, tie photos to project context, preserve daily records, and let office staff see what changed without chasing every foreman.
SiteStamp puts documentation beside the workflows that create it: timesheets, daily logs, photos, drawings, RFIs, submittals, change orders, and punchlists. The field does not have to think like a document controller to leave a useful record.
Buyers want direct answers: what gets stored, who can access it, how records connect, and what it costs. This page answers those questions plainly instead of hiding behind generic claims about productivity.
Clear answers for contractors comparing tools, price, and field adoption.
| Question | SiteStamp | Other option |
|---|---|---|
| Project context | Records live beside field workflows | Folders store files without workflow context |
| Drawings | Upload, access, and mark up plans | PDFs are shared manually |
| RFIs and submittals | Part of the construction record | Often tracked in email or spreadsheets |
| Photos and daily logs | Connected to the project | Scattered across phones and folders |
| Price | $69.99/mo flat | Tool sprawl and admin time |
Construction document management software helps contractors organize and control project records such as drawings, specifications, RFIs, submittals, photos, daily logs, change orders, and closeout documents.
Cloud storage is useful for basic file sharing, but construction teams usually need project context: drawing revisions, RFI links, submittal status, photos, daily logs, and change-order backup.
SiteStamp keeps documents near the field workflows that create the record, including timesheets, daily logs, photos, drawings, RFIs, submittals, change orders, and punchlists.
Start with timesheets, daily logs, photos, drawings, change orders, and certified payroll. Invite everyone who needs access.
Prefer to talk first? Ask for TJ Ohntrup.
Fastest path to a lead: call (267) 251-5845 or start the trial and we will help map your timesheets, logs, photos, and payroll workflow.